26 / 48 · 16 CI/CD Pipelines · Pipeline Optimization← prev⊞ allnext →☰ Read as one page
5.1Why Speed Matters
Slow pipelines erode developer trust. When the pipeline takes 45 minutes, developers stop waiting for it and merge anyway. When the pipeline takes 5 minutes, developers treat it as a reliable safety net and actually look at the results before merging.
The goal: under 5 minutes for the PR feedback loop (lint + unit tests) and under 20 minutes for the full pipeline (including browser tests).