Modern QA2026Key Takeaways — tiles
Log inJoin
61 / 71 · 11 Manual Testing Fundamentals · Risk-Based Testing← prev⊞ allnext →☰ Read as one page

7.8Key Takeaways

  • Risk = Probability x Impact. Test high-risk areas first and deepest.
  • Use risk assessment to allocate limited testing time where it matters most
  • Three estimation techniques: work breakdown, historical analogy, three-point
  • Entry criteria prevent wasted testing on unstable builds
  • Exit criteria define "done enough" — and what to do when they are not met
  • Document your risk-based strategy in a lightweight test plan