61 / 71 · 11 Manual Testing Fundamentals · Risk-Based Testing← prev⊞ allnext →☰ Read as one page
7.8Key Takeaways
- Risk = Probability x Impact. Test high-risk areas first and deepest.
- Use risk assessment to allocate limited testing time where it matters most
- Three estimation techniques: work breakdown, historical analogy, three-point
- Entry criteria prevent wasted testing on unstable builds
- Exit criteria define "done enough" — and what to do when they are not met
- Document your risk-based strategy in a lightweight test plan